Dear Buyers, we offer to your attention the dynamics of construction as of February 25, 1919:
Waterproofing arrangement - 5-10 floor, socle.
Laying - TP, 19, 21, 23 floor.
The arrangement of internal power supply networks is 5-9 floors.
Installation of internal heating and ventilation networks - 1-10 floor.
The arrangement of internal networks of water supply and sewage - 1-10 floor.
Arrangement of finishing works of IZK - 14,75%
The arrangement of door structures and hatches is 4-24 floors.
Mounting of lift equipment - 35% (1-24 floor).
Roofing - 16%
The arrangement of window constructions is 5-16 floors.
The arrangement of metal fence staircases - 6 floors.
Arrangement of external engineering networks - 35%
You can see the photo report on construction in our gallery.
Sincerely, the company "Intergal-Bud"
Стартуют продажи в комплексе бизнес-класса «Владимирский» от компании «Интергал-Буд».
Комплекс располож...
A cozy and comfortable apartment is when there is a lot of free space, an...