Dear buyers, we offer you the dynamics of construction as of 12.11.18:
Concrete slab covering over 24 floors. Vertical structures of the 25th floor are reinforced.
Masonry is carried out - a socle, 2-4, 9-16 floors.
Work is underway to install a hidden extension of power supply networks on typical residential floors in monolithic structures.
Installation of internal networks of heating and ventilation, power supply, water supply, sewerage, lightning-fast networks and smoke removal, smart home systems, screeds, plaster walls, decoration of IGCs - 5th floor.
You can see the photo report on construction in our gallery.
Sincerely, the company "Intergal-Bud"